Marilabakoren — Panoramic Windows, Glazing and Facades
Tested before shipping
Each window unit goes through a pressure and seal test at our facility. You get a certificate with the results, not just a spec sheet.
On-site measurement
We measure every opening ourselves. Quoting from floor plans causes errors, so we send an engineer to the actual site first.
Own production
Aluminum profiles are extruded and coated at our Namdong-gu facility. We control the process from raw material to finished frame.
In-house installers
Our crew does the installation, not a subcontractor. The people who measured your windows are the ones fitting them.
We manufacture and install panoramic window systems, sliding glazing, and aluminum facade panels. The company was founded by two partners who spent years working in the glazing industry before starting their own production line in Incheon.
We handle the full cycle: measurement, engineering, manufacturing, and installation. Most of our work is in Incheon and the greater Seoul area, covering both residential and commercial buildings.








Replaced all windows in our apartment. Street noise dropped to almost nothing. The crew covered the floors without us asking and finished in two days.
Office building curtain wall, south and west faces. They used different glass compositions per orientation. Installation was ahead of schedule.
The sliding system opens the full width of our living room. Floor track sits almost flush. Lead time ran longer than quoted, but they warned us in advance.
We run a clinic. Old single-glazed windows made the space loud and cold. New triple-pane system fixed both problems. The crew worked around our business hours.
Corner glazing for our penthouse. No visible post at the 90-degree joint. Most companies said it wasn't doable in our dimensions. Final invoice ran slightly above estimate.
Coastal house, needed windows rated for high wind. They specified heavier profiles for the seaward side and standard specs for the sheltered side. No issues so far.
Hotel facade with custom bronze finish. They made sample panels so we could check the color in daylight before committing. Exact match to the catalog shade we picked.
Bakery shopfront. Old windows fogged every morning from oven heat. They installed heated inner pane glass. Windows stay clear now, even early mornings in winter.

Runs structural calculations on commercial projects and signs off on every facade installation. Background in aluminum curtain wall systems.

Manages the production queue and installation calendar. Handles client communication, quotes, and warranty coordination.

Leads the installation team. Oversees on-site work from scaffold setup to final seal check. Trains new crew members on glazing tolerances.
Measurement
An engineer visits the site, measures every opening with laser equipment, and checks load-bearing conditions.
Engineering
We build a 3D model, calculate wind and thermal loads, select glass composition, and send you technical drawings for approval.
Production
Profiles are extruded, coated, and assembled at our factory. Glass units are sealed and pressure-tested before packing.
Installation
Our own crew handles fitting. Every panel is checked for alignment, and seals are applied in a continuous bead.
We work across Incheon and the greater Seoul metropolitan area. For larger commercial projects, we can travel further.
Standard residential orders take a few weeks from confirmed measurements to installation. Custom facade panels take longer depending on coating and dimensions.
Yes. Our own crew does every installation. We don't subcontract this part of the work.
Window systems are covered for seal failure, gas leakage, and hardware defects under normal use. Facade panels are warranted against structural deformation. Details are in our terms.
Yes. We do custom powder coating in any RAL shade. For non-standard colors, we produce sample panels first so you can approve the match in natural light.
We do. For apartments and operating businesses, we coordinate the schedule around occupancy and clean up at the end of each day.
Single-pane, double-pane, and triple-pane units. Low-E coatings, argon or krypton gas fill, tempered and laminated options. We recommend based on the building's orientation and requirements.
Custom-manufactured products cannot be returned. Standard catalogue items can be returned within 14 days if unused and in original packaging. See our terms for details.
Marilabakoren
971 Gyeongwon-daero, Namdong-gu
Incheon, South Korea
